Pollution Prevention Plan

Place an order for a custom essay, research paper on this or related subject.

 

 

The pollution prevention program is as a result of the working relationship between public Marina and boatyard in Florida and the neighboring complainants on the pollution in the water ways that is leading into as well as around the marina. The case study has provided public Marina and boatyard with a direct technical assistance on waste reductions. The current waste management techniques and technologies have been reviewed and there have been possible alternatives on elimination as well as reduction of the hazardous and solid wastes, wastewater discharges as well as air emissions which have been evaluated. The waste minimization recommendations does comprise of inventory control, better housekeeping, recycling of the attainable markets as well as product substitution (Paul 1995, pp. 93).  It has also discussed on some of the environmental regulations that do govern the hazardous waste management as well as promote minimization of wastes.  There are also requirements for the Storm Water Pollution prevention plan (SWPPP) which have been discussed. The importance of an effective training of the employees has also been emphasized in the study as well as the success of waste minimization recommendations.

Based on the 1991 emissions report to Jefferson County Air Program, cyclone collector is 100% effectual in removing approximately 98% of all scrap papers (Argonne national library, 1990, pp. 58). Chemical spills are hence absorbed and pumped to the appropriate disposals with no any potential sewer access of the sanitary. The employees need to be informed through the class lectures on the need to keep unauthorized chemicals out of all the water ways.

Marina and boatyard should be introduced to pollution prevention concept hence take some pollution prevention efforts in changing equipments that pollute as well as the slug and material discharge control.

There are various environmental regulations that the entire company as well as its employees ought to follow. In the year 1990, the Clean Air Act was amended and impacted on how the manufacturing facilities did operate. The Act requires an installation of a maximum achievable control technology for all the facilities that do emit more than 10 tons annually of all the listed hazardous air pollutants.  There are various resource tools that will be needed in this multimedia project which comprise of partnerships, technical assistance, outreach, innovation as well as an effective program to correct the existing problem.  There is a need to come up with a technical assistance program for the employees who will include production of the workshops, handbooks and conferences. The employees will be recommended on incentive programs for an innovative hazardous management as well as reduction of the toxic substances.

The NPDES or the National Pollutant Discharge Elimination System stormwater program regulates on the discharges of the stormwater into the surface waters from construction and industrial activities as well as the municipal. Boatyards and Marinas are two categories of the industrial activity which ought to obtain a general NPDES permit. The permit involves implementing and creating Stormwater pollution Prevention Plan (SWPPP).  SWPPP is usually a comprehensive plan which is designed in order to implement and identify the best management practices which are meant to reduce and prevent pollutants that are associated with the industrial activities from entering in the discharges of the storm water (Keith, 2004, pp. 69). The Marinas ought to obtain the NPEDES permit and have the SWPPP in order to become one designated clean marina.

Everybody will be assigned duties and among them will be the SWPPP coordinator whose duties will be to:

 

  • Creating a SWPPP team who will aid in implementing the SWP3 plan
  • Oversee on the maintenance practices
  • Implement on SWP3 plan
  • Provide and conduct monitoring and inspection activities
  • Oversee that the employees are trained
  • Submit as well as prepare the reports
  • Identify some potential pollutant sources making sure that they are added to the plan
  • Identify all the deficiencies in the SWPPP to make sure that they are fully corrected.

In order to prevent on the impacts of stormwater, all the entering trailers and boats will need to be inspected for possible leaks.  The recycling bins should be located next to the launch lamp in order to reduce the solid wastes.  There should be a fish cleaning facility which will offer effective disposal of the fish wastes as well as the battery and oil recycling bins.

All the cleaning operations should be highly prohibited in the water. The facility will need to regularly rest and inspect in the systems and site equipments in order to uncover the conditions which would lead to breakdowns and failures which will result to discharges of the pollutants to the surface waters.

All the employees will be trained and will be required to attend a training course. The training will be reviewed monthly by SWPPP coordinator in order to determine on the effectiveness as well as make the necessary changes on the program. The training will involve:

  • Proper handling of the material and effective housekeeping
  • Control as well as disposal of the solid and liquid wastes
  • Spill response and prevention
  • Fuelling procedures
  • Proper methods of disposal for the vessel wastewaters
  • Identifying some of the barriers to prevention of pollution
  • Incorporating the pollution prevention issues into effective permits among others.

Through the training and implementation of effective measures by the facilitators there will be reduced measures of pollutants of boatyards and Marinas.